The Roboze Argo 500 technology enables advanced production of spare parts using materials such as Ultem 9085 and Carbon Peek, known for their strength and lightness. These materials allow for the replacement of traditional metal parts, typically made through mechanical processing methods, thus reducing costs and delivery times. The collaboration between Hitachi Rail and Roboze extends beyond the supply of technologies. The railway manufacturer will also benefit from the engineering support and consultancy provided by Roboze experts, both in Italy and the United States. This will ensure continuous and specialized support, further optimizing production processes.
